Right of Way PermitsWhen Do I Need to Obtain a Right-of-Way Permit? A Right-of-Way Use Permit is required for any work performed in the public right-of-way (including but not limited to sewer or water extensions, franchise utility work, storm drainage, driveway connections, sidewalks, curbs and gutters, landscaping, undergrounding of utilities, street lighting, paving or any other excavation or pertinent installation in the right-of-way). What is the process?
Click here for the Right of Way Permit Application. Right-of-Way Management Tips It is always important to be aware of underground utilities before you dig in the right-of-way. Be sure to contact Sunshine State One-Call of Florida at 1-800-432-4770 at lease 48 hours before you dig but not more than 5 days. Have the following information ready when calling:
You will then have to wait 48 hours for underground facilities to be marked. Respect and protect the facility operator's marks. Color Codes For Utilities The American Public Works Association has established a Uniform Color Code for marking underground utility lines as follwos:
Dig with care! Always hand dig when within two feet, on either side, of any marked lines. APWA's Guideline For Uniform Temporary Marking of Underground Utilities (Adobe PDF Format) |